Skip to content
Locomotive-Specs
Bombardier BR 377/7 – photo 1© trainspo.com
Electric multiple unit

Bombardier BR 377/7

Built by Bombardier

Top speed
100 km/h
62 mph
Power output
2,000 kW
2,682 hp
Track gauge
1,435 mm
Standard gauge
Years built
2014
8 units

Overview of the Bombardier BR 377/7

Discover the BR 377/7, a modern Electric Multiple Unit (EMU) perfect for urban and suburban routes.

Built by Bombardier in 2014, this train is known for its efficiency and capacity.

With a top speed of 100 km/h and a power output of 2000 kW, the BR 377/7 is engineered for swift and dependable service.

Its 5-car formation (2M) and 1435 mm gauge make it adaptable to various rail networks.

Featuring dual electric systems (25 kV AC and 750 V DC third rail), this EMU exemplifies cutting-edge UK railway engineering.

Seen operating with New Southern Railway Ltd. as part of the SN 377/7 class, this train represents advancements in passenger rail transport.

Bombardier BR 377/7 technical specifications

Value
Built byBombardier · 20148 units
Top speed100 km/h62 mph
Power output2,000 kW2,682 hp
Electric systems
  • 25 kV AC 50 Hz
  • 750 V DC (3rd rail)
Track gauge1,435 mmStandard gauge4 ft 8½ in
Formation5 cars (2M)

Operators of the Bombardier BR 377/7

Railway companies that have operated the BR 377/7, with the class designation used by each of them.

OperatorClassCountry
New Southern Railway Ltd.SN 377/7United Kingdom

Bombardier BR 377/7 photos

Photos © their respective authors, shared on trainspo.com. They may show liveries or variants that differ from the specifications above.

More electric multiple units from Bombardier

All Bombardier models

Similar electric multiple units from other manufacturers

All electric multiple units