Skip to content
Locomotive-Specs
BR 4CEP – photo 1© trainspo.com
Electric multiple unit

BR 4CEP

Built by BR

Top speed
140 km/h
87 mph
Track gauge
1,435 mm
Standard gauge
Years built
1979–1984
122 units

Overview of the BR 4CEP

Explore the 4CEP, an iconic British Electric Multiple Unit (EMU).

Built between 1979 and 1984, this versatile train served various operators including British Railways Board, Connex South Eastern, and South West Trains.

Reaching speeds of up to 140 km/h, the 4CEP operates on a 750 V DC third-rail electric system, featuring a 1435 mm gauge and dimensions of 2.82 m width and 3.81 m height.

The 4CEP represents a key part of British railway heritage, offering reliable passenger service.

BR 4CEP technical specifications

Value
SeriesBR 411
Built byBR · 1979–1984122 units
Top speed140 km/h87 mph
Electric systems
  • 750 V DC (3rd rail)
Track gauge1,435 mmStandard gauge4 ft 8½ in
Width2.82 m9 ft 3 in
Height3.81 m12 ft 6 in

Operators of the BR 4CEP

Railway companies that have operated the 4CEP, with the class designation used by each of them.

OperatorClassCountry
British Railways BoardBR 411/5United Kingdom
Connex South EasternCSE 411/5United Kingdom
South West TrainsSWT 411/5United Kingdom

BR 4CEP photos

Photos © their respective authors, shared on trainspo.com. They may show liveries or variants that differ from the specifications above.

More electric multiple units from BR

All BR models

Similar electric multiple units from other manufacturers

All electric multiple units