Skip to content
Locomotive-Specs
CRRC Nanjing Puzhen 01A05 – photo 1© trainspo.com
Electric multiple unit

CRRC Nanjing Puzhen 01A05

Built by Alstom, CSR Nanjing Puzhen

Top speed
80 km/h
50 mph
Track gauge
1,435 mm
Standard gauge
Years built
2006–2007
128 units

Overview of the CRRC Nanjing Puzhen 01A05

Discover the SM 01A05, an Electric Multiple Unit (EMU) operating on the Shanghai Metro.

Built by Alstom and CSR Nanjing Puzhen between 2006 and 2007, this model is designed for efficient urban network operation.

With a top speed of 80 km/h and an 8-car formation (6M2T), it transports passengers on the Shanghai Metro line.

Its standard gauge of 1435 mm and 1.5 kV DC electrical systems are well-suited for modern rail infrastructure, ensuring reliability and performance.

The width of 3 m and height of 3.8 m optimize its passage through tunnels and across tracks.

This train is a significant part of the Shanghai Metro's rolling stock, contributing to traffic flow and urban mobility.

A cornerstone of Chinese railway engineering, the SM 01A05 exemplifies a commitment to quality public transport.

Explore this model to understand its role in the development of the metropolitan network.

CRRC Nanjing Puzhen 01A05 technical specifications

Value
Built byAlstom, CSR Nanjing Puzhen · 2006–2007128 units
Top speed80 km/h50 mph
Electric systems
  • 1.5 kV DC
Track gauge1,435 mmStandard gauge4 ft 8½ in
Formation8 cars (6M2T)
Width3 m9 ft 10 in
Height3.8 m12 ft 6 in

Operators of the CRRC Nanjing Puzhen 01A05

Railway companies that have operated the 01A05, with the class designation used by each of them.

OperatorClassCountry
Shanghai MetroSM 01A05China

More electric multiple units from CRRC Nanjing Puzhen

All CRRC Nanjing Puzhen models

Similar electric multiple units from other manufacturers

All electric multiple units