Skip to content
Locomotive-Specs
Hitachi ETR 421 – photo 1© trainspo.com
Electric multiple unit

Hitachi ETR 421

Built by Hitachi

Top speed
160 km/h
99 mph
Power output
3,400 kW
4,559 hp
Track gauge
1,435 mm
Standard gauge
Years built
2019

Overview of the Hitachi ETR 421

Discover the modern ETR 421, also known as the Caravaggio, a high-performance Electric Multiple Unit (EMU) designed for Italian railways.

Built by Hitachi starting in 2019, this sleek train boasts a top speed of 160 km/h and a spacious capacity for 463 passengers. Its efficient 4-car formation (2M2T) and 1435 mm gauge make it a versatile addition to rail networks.

Operating in Italy with carriers like Italian State Railways, Trenitalia-LeNord, and Trenitalia-TPER, the ETR 421 is engineered for reliability and passenger comfort. Its robust design includes a power output of 3400 kW, ensuring smooth and timely journeys.

Hitachi ETR 421 technical specifications

Value
SeriesCaravaggio
Built byHitachi · 2019
Top speed160 km/h99 mph
Power output3,400 kW4,559 hp
Electric systems
  • 3 kV DC
Track gauge1,435 mmStandard gauge4 ft 8½ in
Formation4 cars (2M2T)
Capacity463 seats
Car length110 m360 ft 11 in
Width2.8 m9 ft 2 in
Height4.3 m14 ft 1 in
Axle load18.5 t40,785 lb
Datasheetitaly.hitachirail.com

Operators of the Hitachi ETR 421

Railway companies that have operated the ETR 421, with the class designation used by each of them.

OperatorClassCountry
Italian State RailwaysFS ETR 421Italy
Trenitalia-LeNordTrenord ETR 421Italy
Trenitalia-TPERTTX ETR 421Italy

Hitachi ETR 421 photos

Photos © their respective authors, shared on trainspo.com. They may show liveries or variants that differ from the specifications above.

More electric multiple units from Hitachi

All Hitachi models

Similar electric multiple units from other manufacturers

All electric multiple units