Skip to content
Locomotive-Specs
Hyundai Rotem New Zealand FP/FT – photo 1© trainspo.com
Electric multiple unit

Hyundai Rotem New Zealand FP/FT

Built by Hyundai Rotem

Length
43.06 m
141 ft 3 in
Track gauge
1,067 mm
Cape gauge
Years built
2008–2016
83 units
Axle arrangement
Bo'Bo'+2'2'

Overview of the Hyundai Rotem New Zealand FP/FT

Discover the New Zealand FP/FT, an impressive EMU electric multiple unit operating on the 1067 mm gauge.

Built by Hyundai Rotem between 2008 and 2016, these trains are formed of 2 cars in a 1M1T configuration.

Serving with Transdev Wellington under the Metlink FP/FT class, these trains measure 43.06 meters in length and operate on 1.5 kV DC electric systems.

These New Zealand trains are a key part of the nation's rail network.

Hyundai Rotem New Zealand FP/FT technical specifications

Value
Built byHyundai Rotem · 2008–201683 units
Electric systems
  • 1.5 kV DC
Track gauge1,067 mmCape gauge3 ft 6 in
UIC axle arrangementBo'Bo'+2'2'
Formation2 cars (1M1T)
Train length43.06 m141 ft 3 in
Width2.73 m8 ft 11 in
Height3.64 m11 ft 11 in

Operators of the Hyundai Rotem New Zealand FP/FT

Railway companies that have operated the New Zealand FP/FT, with the class designation used by each of them.

OperatorClassCountry
Transdev WellingtonMetlink FP/FTNew Zealand

Hyundai Rotem New Zealand FP/FT photos

Photos © their respective authors, shared on trainspo.com. They may show liveries or variants that differ from the specifications above.

More electric multiple units from Hyundai Rotem

All Hyundai Rotem models

Similar electric multiple units from other manufacturers

All electric multiple units