© trainspo.comKawasaki OM 1000 series
Built by Hitachi, Kawasaki
Overview of the Kawasaki OM 1000 series
Discover the OM 1000 series, an iconic monorail electric multiple unit (EMU) from Japan, serving the Osaka Monorail network.
Built by Hitachi and Kawasaki between 1989 and 1998, and later refurbished from 2007 to 2009, these trains showcase a commitment to technological excellence and ongoing maintenance.
With a top speed of 75 km/h, the OM 1000 series features a 4-car formation, perfectly suited for the demands of monorail operations. Its electrical system runs on 1.5 kV DC, ensuring efficient and reliable performance.
These notable trains are a significant part of Japan's transportation history, offering a unique travel experience and contributing to urban mobility in the Osaka region.
Kawasaki OM 1000 series technical specifications
| Value | Imperial / US | |
|---|---|---|
| Built by | Hitachi, Kawasaki · 1989–1998 | |
| Refurbished | 2007 - 2009 | |
| Top speed | 75 km/h47 mph | |
| Electric systems |
| |
| Track gauge | monorail | |
| Formation | 4 cars |
Operators of the Kawasaki OM 1000 series
Railway companies that have operated the OM 1000 series, with the class designation used by each of them.
| Operator | Class | Country |
|---|---|---|
| Osaka Monorail | OM 1000 | Japan |
More electric multiple units from Kawasaki

Kawasaki
Tokyo Metro 02
Electric multiple unit
1988 · 75 km/h

Kawasaki
Toei 12-000 series
Electric multiple unit
1990–2001 · 70 km/h

Kawasaki
SMRT C151
Electric multiple unit
1986–1989 · 90 km/h

Kawasaki
Keihan 8000
Electric multiple unit
1989–1990 · 110 km/h

Kawasaki
Tokyo Metro 01 series
Electric multiple unit
1983 · 80 km/h

Kawasaki
Tokyo Metro 03
Electric multiple unit
1988 · 110 km/h

Kawasaki
Tokyo Metro 9000 series
Electric multiple unit
1990–2009 · 110 km/h

Kawasaki
JNR 415-1500
Electric multiple unit
1986 · 100 km/h
Similar electric multiple units from other manufacturers

Mitsubishi
ShM 500
Electric multiple unit
75 km/h

Mitsubishi
ShM 5000
Electric multiple unit
75 km/h

ABB
IM LRV
Electric multiple unit
80 km/h

Alstom
MP 89 CA
Electric multiple unit
80 km/h

Hitachi
Sentosa Express
Electric multiple unit
80 km/h

Hitachi
Tama Mono 1000
Electric multiple unit
80 km/h

Hyundai Rotem
AM Hyundai Rotem
Electric multiple unit
80 km/h

Siemens
Bursaray B80
Electric multiple unit
70 km/h