© trainspo.comHitachi BR 395
Built by Hitachi
Overview of the Hitachi BR 395
Discover the BR 395, a modern electric multiple unit designed for high-speed passenger service in the United Kingdom. Operated by Southeastern Railway as the Class SE 395, this sleek train is built for efficiency and comfort.
The BR 395, also known as the Hitachi A-train, features a contemporary design and was constructed between 2007 and 2009. It boasts an impressive top speed of 225 km/h, making it a swift and reliable option for commuters and travelers alike.
With a capacity of 340 seats and a formation of 6 cars (4M2T), the BR 395 offers ample space for passengers. Its operational flexibility is enhanced by dual electric systems, supporting both 25 kV AC 50 Hz and 750 V DC (3rd rail) power sources. The standard gauge of 1435 mm ensures compatibility with the UK rail network.
This advanced train represents a significant step forward in British rail transport, combining speed, capacity, and modern engineering to deliver an exceptional travel experience.
Hitachi BR 395 technical specifications
| Value | Imperial / US | |
|---|---|---|
| Family | A-train | |
| Built by | Hitachi · 2007–200929 units | |
| Top speed | 225 km/h140 mph | |
| Electric systems |
| |
| Track gauge | 1,435 mmStandard gauge4 ft 8½ in | |
| Formation | 6 cars (4M2T) | |
| Capacity | 340 seats | |
| Train length | 122 m400 ft 3 in | |
| Width | 2.81 m9 ft 3 in |
Operators of the Hitachi BR 395
Railway companies that have operated the BR 395, with the class designation used by each of them.
| Operator | Class | Country |
|---|---|---|
| Southeastern Railway | SE 395 | United Kingdom |
Hitachi BR 395 photos
Photos © their respective authors, shared on trainspo.com. They may show liveries or variants that differ from the specifications above.
More electric multiple units from Hitachi

Hitachi
700
Electric multiple unit
2005

Hitachi
800
Electric multiple unit
2004 · 260 km/h

Hitachi
500 V
Electric multiple unit
2008–2010 · 285 km/h

Hitachi
E4
Electric multiple unit
1997 · 240 km/h

Hitachi
Korail 200000
Electric multiple unit
2009 · 165 km/h

Hitachi
N700-5000
Electric multiple unit
2007–2016 · 300 km/h

Hitachi
THSRC 700T
Electric multiple unit
2007 · 300 km/h

Hitachi
E1
Electric multiple unit
1994–1995 · 240 km/h
Similar electric multiple units from other manufacturers

UGL Rail
H set
Electric multiple unit
2006

Alstom
Sm6
Electric multiple unit
2009–2011 · 220 km/h

Bombardier
2009 Stock
Electric multiple unit
2009–2011

CAF
CAF Hizlitren
Electric multiple unit
2007–2010 · 250 km/h

CRRC Qingdao Sifang
CRH2E
Electric multiple unit
2007 · 250 km/h

Hyundai Rotem
KRRI TTX
Electric multiple unit
2007 · 200 km/h

Alstom
ETR 600
Electric multiple unit
2006–2008 · 250 km/h

Alstom
ETR 610
Electric multiple unit
2006–2010 · 250 km/h