Skip to content
Locomotive-Specs
Alstom CRH5A – photo 1© trainspo.com
Electric multiple unit

Alstom CRH5A

Built by Alstom, CRRC Changchun Railway Vehicles

Top speed
250 km/h
155 mph
Power output
5,500 kW
7,376 hp
Track gauge
1,435 mm
Standard gauge
Years built
2004
140 units

Overview of the Alstom CRH5A

Experience the CRH5A, a high-speed electric multiple unit (EMU) designed for China's railway network.

Developed by Alstom and CRRC Changchun Railway Vehicles, this series, also known as the "New Pendolino," began production in 2004.

With a top speed of 250 km/h and a formation of 8 cars (5M3T), the CRH5A offers efficient and modern passenger transport.

It operates on a 1435 mm gauge track and utilizes a 25 kV AC 50 Hz electric system, delivering a powerful 5500 kW output.

This impressive train measures 211.5 meters in length, 3.2 meters in width, and 4.27 meters in height, serving the China Railway Corporation.

Alstom CRH5A technical specifications

Value
SeriesNew Pendolino
Built byAlstom, CRRC Changchun Railway Vehicles · 2004140 units
Top speed250 km/h155 mph
Power output5,500 kW7,376 hp
Electric systems
  • 25 kV AC 50 Hz
Track gauge1,435 mmStandard gauge4 ft 8½ in
Formation8 cars (5M3T)
Car length211.5 m693 ft 11 in
Width3.2 m10 ft 6 in
Height4.27 m14 ft 0 in

Operators of the Alstom CRH5A

Railway companies that have operated the CRH5A, with the class designation used by each of them.

OperatorClassCountry
China Railway CorporationCR CRH5AChina

Alstom CRH5A photos

Photos © their respective authors, shared on trainspo.com. They may show liveries or variants that differ from the specifications above.

More electric multiple units from Alstom

All Alstom models

Similar electric multiple units from other manufacturers

All electric multiple units