Skip to content
Locomotive-Specs
BREL BR 319/0 – photo 1© trainspo.com
Electric multiple unit

BREL BR 319/0

Built by BREL

Top speed
160 km/h
99 mph
Track gauge
1,435 mm
Standard gauge
Years built
1987–1988
13 units

Overview of the BREL BR 319/0

Discover the BR 319/0, an iconic electric multiple unit (EMU) that served the railways of the United Kingdom.

Built by BREL between 1987 and 1988, this series, part of the BR Mark 3 family, represents an important chapter in British railway history.

With a top speed of 160 km/h and a 4-car formation, the BR 319/0 was designed for efficiency and reliability.

Equipped with advanced electric systems, capable of operating on both 25 kV AC 50 Hz and 750 V DC via a third rail, this train ensured operational flexibility.

Some units also underwent significant refurbishment and modernization between 1996 and 1997, confirming their long service life.

Explore the robustness and functional design of this historic rail convoy.

BREL BR 319/0 technical specifications

Value
SeriesBR 319
FamilyBR Mark 3
Built byBREL · 1987–198813 units
Refurbished1996 - 1997 (7)
Top speed160 km/h99 mph
Electric systems
  • 25 kV AC 50 Hz
  • 750 V DC (3rd rail)
Track gauge1,435 mmStandard gauge4 ft 8½ in
Formation4 cars

Operators of the BREL BR 319/0

Railway companies that have operated the BR 319/0, with the class designation used by each of them.

OperatorClassCountry
British Railways BoardBR 319/0United Kingdom

BREL BR 319/0 photos

Photos © their respective authors, shared on trainspo.com. They may show liveries or variants that differ from the specifications above.

More electric multiple units from BREL

All BREL models

Similar electric multiple units from other manufacturers

All electric multiple units