Skip to content
Locomotive-Specs
BREL BR 315 – photo 1© trainspo.com
Electric multiple unit

BREL BR 315

Built by BREL

Top speed
121 km/h
75 mph
Power output
656 kW
880 hp
Weight
128 t
282,191 lb
Track gauge
1,435 mm
Standard gauge
Years built
1980–1981
61 units

Overview of the BREL BR 315

Discover the BR 315, a resilient Electric Multiple Unit (EMU) built by BREL between 1980 and 1981.

Originally from the PEP family, this train underwent significant refurbishment by Bombardier from 2004 to 2008, enhancing its capabilities.

Boasting a top speed of 121 km/h, seating for 318 passengers, and a powerful 656 kW output, the BR 315 has been a reliable workhorse for operators like Abellio Greater Anglia and London Overground.

Its robust construction, measuring 3.58 m wide and 2.82 m high, makes it well-suited for high-capacity passenger services.

Operating on 25 kV AC 50 Hz electric systems and weighing 128 tonnes with a 1435 mm gauge, the BR 315 exemplifies dependable railway engineering.

BREL BR 315 technical specifications

Value
SeriesPEP
FamilyPEP
Built byBREL · 1980–198161 units
RefurbishedBombardier 2004 - 2008
Top speed121 km/h75 mph
Power output656 kW880 hp
Electric systems
  • 25 kV AC 50 Hz
Track gauge1,435 mmStandard gauge4 ft 8½ in
Capacity318 seats
Width3.58 m11 ft 9 in
Height2.82 m9 ft 3 in
Weight128 t282,191 lb

Operators of the BREL BR 315

Railway companies that have operated the BR 315, with the class designation used by each of them.

OperatorClassCountry
Abellio Greater AngliaAGA 315United Kingdom
Greater AngliaGA 315United Kingdom
London Overground Rail Operations LtdLO 315United Kingdom
National Express East AngliaNXEA 315United Kingdom
TfL RailTfL 315United Kingdom

BREL BR 315 photos

Photos © their respective authors, shared on trainspo.com. They may show liveries or variants that differ from the specifications above.

More electric multiple units from BREL

All BREL models

Similar electric multiple units from other manufacturers

All electric multiple units