© trainspo.comTorVZ ET4A
Built by TorVZ
Overview of the TorVZ ET4A
Discover the impressive ET4A Electric Multiple Unit (EMU), a testament to Russian railway engineering.
Built by TorVZ between 2011 and 2013, these modern trains are designed for efficient and comfortable public transportation.
With a top speed of 130 km/h and a 6-car formation, the ET4A series efficiently serves numerous passengers on the broad 1520 mm Russian gauge.
Operating on a 3 kV DC electric system, these EMUs are a reliable and high-performing choice for Russian Railways.
Experience the next generation of rail travel with the ET4A.
TorVZ ET4A technical specifications
| Value | Imperial / US | |
|---|---|---|
| Built by | TorVZ · 2011–20134 units | |
| Top speed | 130 km/h81 mph | |
| Electric systems |
| |
| Track gauge | 1,520 mmRussian broad gauge4 ft 11⅞ in | |
| Formation | 6 cars |
Operators of the TorVZ ET4A
Railway companies that have operated the ET4A, with the class designation used by each of them.
| Operator | Class | Country |
|---|---|---|
| Russian Railways | RZD ET4A | Russia |
TorVZ ET4A photos
Photos © their respective authors, shared on trainspo.com. They may show liveries or variants that differ from the specifications above.
More electric multiple units from TorVZ
Similar electric multiple units from other manufacturers

CRRC Nanjing Puzhen
GRT
Electric multiple unit
130 km/h

DMZ
ED9E
Electric multiple unit
130 km/h · 3,520 kW

DMZ
ED9T
Electric multiple unit
130 km/h · 3,520 kW

MLRZ
EM2
Electric multiple unit
130 km/h · 4,000 kW

MLRZ
EM2I
Electric multiple unit
130 km/h · 4,000 kW

MRLZ
EM4
Electric multiple unit
130 km/h · 2,820 kW

RVR
ER7
Electric multiple unit
130 km/h

TEVZ
SR ES
Electric multiple unit
130 km/h · 4,000 kW



